These will be upgrades completed on an as-needed basis to various lift stations throughout the Commission’s system to meet both current and future needs. This may include upgrades to new developer related pump stations. This included the current upgrade to the Two Notch #2 Station to include new...
Upgrade/replace approximately 11,000 linear feet of main along Old Orangeburg Road and Platt Springs Road of 24” Gravity Main. This project will provide gravity sewer service to all of the properties along Old Orangeburg Road to Platt Springs Road. Master Plan Project #4 Old Orangeburg Road Trunk...
Replace/upsizing approximately 4,200 liner feet of water main along Edmund Highway to ten (10) inch watermain and the installation of approximately 500 LF of six (6) inch water main along Maple Street.
The project will consist of the replacement of approximately 3,800 LF of 6" water main, four hydrants and sixteen water services. The main will be replaced with a new 10" water main and all new appurtenances. The Commission received SRF Principal Forgiveness Funding for the project.
The Commission will replace certain water mains in Pelion as a preventative measure due to the continuous failures of the water mains along Mulberry, Lydia and Pine streets. In addition, these water mains will be increased in size to increase system flows and fire flow.
Construction of approximately 9,000 linear feet of twenty-four (24) inch water main and associated appurtenances along Platt Springs Road from Platt Springs Rd Tank to White Knoll High School. 2024 Master Plan Projects #1. System demand in the area has expedited this project.
Construciton of approximately 5,400 linear fee of twenty-four (24) inch water main and associated appurtenances along Sherwood Road from Roscoe Road to Calks Ferry Road.
Construction of approximately 30,000 linear feet of thirty (30) inch water main and associated appurtenances along Old Farm, Rawl, Smith Pond, Belo and Roscoe Road. This will be a new transmission main to increase capacity to the southern side of the system and relieve pressure off of Highway One...
Construction of an 2-million gallon Elevated Water Tank to supply the new Calico Farms and surrounding areas with water. May adjust the hydraulic grade line in the area with the construction of this tank.