Project Description
The Commission will replace certain water mains in Pelion as a preventative measure due to the continuous failures of the water mains along Mulberry, Lydia and Pine streets. In addition, these water mains will be increased in size to increase system flows and fire flow.
Project Engineer
Wooten
Project Contractor
H. Senn Construction